Parquet
Oak and other species, planks, herringbone or chevron; pre-finished or sanded on site.

Wooden floors, wood- or stone-effect porcelain, resin and microcement; windows, patio doors, sliders and shutters. We help you choose, supply and install with specialist crews, alone or within a full renovation.
Oak and other species, planks, herringbone or chevron; pre-finished or sanded on site.
Large stone, concrete or wood-effect slabs: tough and easy to clean.
Seamless surfaces without joints, also ideal for bathrooms, shops and restaurants.
Thin and floating floors to renew without demolishing.
Subfloors, self-levelling screeds and radiant systems.
Restoring existing parquet and Venetian terrazzo floors.



Illustrative images and videos created with artificial intelligence to show the type of work: they do not depict real sites or clients.
Excellent insulation and low maintenance, with good value.
Warm wood inside, tough aluminium outside.
Slim frames and large glazing, ideal for sliders and lift-and-slide doors.
Shutters, motorised roller blinds, louvres and insect screens.
Seals and tapes to installation best practice, to avoid draughts and mould.
Window replacement can qualify for the ecobonus when the requirements are met.
Often yes, with thin, floating or glued floors, checking flatness and the heights of doors and thresholds. You avoid demolition, dust and disposal.
Yes: meeting the insulation requirements, window replacement falls under the ecobonus, in 2026 at 50% for the main residence and 36% for other properties. We prepare the paperwork.
Installation in an apartment usually takes one or two days once the made-to-measure windows are ready.
Yes. We come to the property, measure, check systems and structures and give you a written, itemised quote. You pay nothing and commit to nothing.
The price written in the contract is the final price for the work described. If during the job you decide to add or change something, we quote it in writing first: no extra item appears on the invoice without your approval.
Start date, completion date and intermediate stages are written into the contract, together with the work schedule. Crews and materials are planned before the site opens, so the calendar does not depend on last-minute availability.
Tell us the square metres, number of windows and town: we arrange the free survey.