Ordering furniture late
Production times are the bottleneck: order before closing.

A hotel has a precise work window. Here is how to fit design, permits, orders, site and furniture together so the reopening date does not move.
Production times are the bottleneck: order before closing.
Building, systems, furniture and fire doors under different contracts: nobody answers for others’ delays.
Fire safety, accessibility and acoustics must be in the design, not at the end.
The new rooms must be online before reopening to raise the average rate.
Contract use needs materials that withstand intensive use and are easy to clean.
A schedule with margins and batches lets you reopen even if one floor takes longer.
We follow the whole path with hotel renovation, contract furniture and the turnkey hotel package, which adds photos, website and software.
Yes, by batches of rooms or floors, separating routes and concentrating noisy work at agreed times.
Ideally during the previous season, so orders and permits are ready when closing begins.
Property, rooms and closing dates: we propose a schedule.